• Bureau Junction, IL – Water System Improvements

You must be logged in to be added to the Plan Holders list.
Login/Register

Log In

Project Details

Name

Bureau Junction, IL - Water System Improvements

Description

Complete replacement of two existing steel aerator tanks, 10,000 gallons each, along with blast and re-coat interior of 26’ diameter, 300,000 gallon standpipe including miscellaneous repairs.  See Specifications Section 01 1000 – Summary for more details.

BIDDERS ARE ADVISED TO CHECK THE WEBSITE FREQUENTLY FOR ISSUED ADDENDA.

Bid Date

November 19, 2024 2:00pm

Bid Location

Village Clerk Office, 101 E. Nebraska St., Bureau, IL 61315

Estimate

Pre-Bid Meeting Date

Pre-Bid Meeting Location

Project Contact

Don W. Bixby, P. E.

815-223-3344

Project Documents

Bid Docs

Bid Docs

You need to be added to the Plan Holders list to access these files.

You must be logged in to be added to the Plan Holders list.
Login/Register

Project Addendums

Downloads

Sorry, there is no Project Addendums download available.








Project Addendums

You need to be added to the Plan Holders list to access these files.

You must be logged in to be added to the Plan Holders list.
Login/Register

Project Specs

Project Plans

Downloads


Sorry, there are no Project Plans available.

Plan Holders List

Additional Downloads

Downloads

Plan Holders List

Go Back
CompanyGA Rich
NameAndy Snyder
EmailEmail hidden; Javascript is required.
Phone(309) 303-3255
ProjectBureau Junction, IL - Water System Improvements
Interested in this project as:
  • Sub-Contractor
Address204 S Perry St
Deer Creek, Illinois 61733
Map It
Date AddedOctober 28, 2024
Go Back

You must be logged in to be added to the Plan Holders list.
Login/Register

Scroll to Top